
Key takeaways
- Describe the cargo parcel rather than relying on the vessel category alone.
- Separate confirmed requirements from preferences and unresolved questions.
- Include terminal handling arrangements and the source of port restrictions.
- Ask owners to identify qualifications instead of treating every response as fully compliant.
Begin with the transport problem
Handysize is a market description, not a complete specification for an individual ship. An enquiry that simply requests a Handysize vessel leaves recipients to guess the cargo intake, equipment, dates and port requirements. Those guesses can produce apparently attractive responses that address different jobs.
Start with the cargo owner’s actual objective. Is the shipment a single homogeneous parcel, several grades that must remain separate, or a combination of bulk and packaged material? Does the receiver require delivery to a particular terminal, or can an alternative berth serve the same purpose? These questions define the practical search before anyone debates freight.
State the cargo description, proposed quantity, tolerance, packaging where relevant, expected stowage information and any segregation requirement. Identify which party controls final quantity. A seller’s commercial description may be useful for sales, but the shipping team also needs the cargo information that the owner and master will use for acceptance.
For applicable solid bulk cargoes, the IMSBC Code addresses safe shipment and cargo hazards. The enquiry should therefore request appropriate cargo documentation rather than infer transport characteristics from a sales name. IMO: IMSBC Code
Make dates meaningful
A date without an event is ambiguous. Cargo available in a warehouse, cargo delivered to a port stockpile, cargo cleared for export and cargo ready to load are different milestones. Identify the milestone behind the proposed loading window and the party responsible for confirming it.
Describe the flexibility honestly. If production may finish later, say what evidence will establish readiness and when that evidence is expected. If the receiver has a narrow delivery requirement, distinguish that preference from the proposed contractual loading dates. An owner can assess an uncertain schedule more intelligently when the uncertainty is visible.
The same discipline applies to the vessel’s position. Ask for the ship’s opening area, expected availability and any prior employment affecting arrival. Treat this as information requiring updates, rather than converting the first position report into an arrival promise. Keep commercial dates aligned with the latest cargo and vessel evidence.
Specify equipment by function
An enquiry should explain what the equipment must accomplish. Asking for a geared vessel is incomplete if the terminal expects the ship to provide grabs, particular outreach, or an arrangement suited to its receiving equipment. List the proposed handling method and identify who supplies each component.
Do not select equipment based only on an advertised lifting figure. Ask the owner and terminal to confirm suitability for the intended operation, including the relevant working configuration. Where an unusual lift or packaged parcel is involved, technical review should precede any assumption that the ship can perform it.
Also describe any requirement for hold access, parcel separation or cargo protection. These details help owners decide whether their vessel deserves a closer review. They should not be presented as engineering conclusions made by the chartering desk.
Use an enquiry completeness checklist
| Enquiry item | Evidence to include | Question that must remain visible |
|---|---|---|
| Cargo identity | Shipper’s description and available transport documents | Is the final shipping description confirmed? |
| Quantity | Proposed parcel and tolerance basis | Who exercises the tolerance? |
| Volume | Stowage information and its source | Does it represent this parcel? |
| Ports | Named terminals and current local contacts | Are alternatives acceptable? |
| Handling | Shore or ship equipment expectations | Who supplies grabs and ancillary equipment? |
| Dates | Defined readiness milestone and proposed window | What could move the window? |
| Commercial basis | Requested quote scope | Which costs or services are excluded? |
Assign an owner to every blank cell. A missing answer can remain pending at the enquiry stage, but it should never disappear into a phrase such as “usual terms.” Record whether the gap prevents quotation, requires a qualification, or can be closed before final commitment.
A short covering message can summarize the decision required: provide suitable vessel proposals, identify material deviations and state the basis of the freight indication. Supporting documents should then answer the detailed questions without forcing every recipient to reconstruct the shipment from a long email chain.
Keep revisions traceable
Create a single current enquiry with a revision label and issue date. When quantity, loading place or dates change, explain the change explicitly. Quietly replacing an attachment creates the possibility that an owner prices the old cargo while the charterer evaluates the response against the new requirement.
Maintain a response register. Capture the vessel proposed, response validity, material exclusions, outstanding technical reviews and next action. A response with several unresolved qualifications may still be useful, but it should not appear beside a fully qualified proposal as though the two offer the same certainty.
For sensitive information, decide what needs to be shared at each stage. The practical goal is enough information to assess suitability and price the actual work. Avoid sending unrelated commercial material merely because it happens to be bundled with the cargo specification.
Fictional case: the missing discharge arrangement
A fictional trader seeks a Handysize ship for a bulk parcel to a regional receiver. The initial enquiry names the discharge port but says nothing about handling. Several owners respond, and the lowest indication appears attractive.
Before shortlisting, the trader’s coordinator asks the receiver to describe the berth operation. The receiver expects shipboard gear and compatible grabs, while the lowest indication assumes shore equipment. A second proposal includes suitable equipment, subject to terminal review. The original price comparison has therefore compared different services.
The coordinator reissues the handling section and asks all respondents to price the same scope. The trader also adds a named terminal contact and makes equipment confirmation an explicit outstanding item. The improvement is not a promise of lower freight; it is a clearer understanding of what each proposal actually provides.
Common mistakes
Copying an old enquiry can preserve obsolete berth restrictions or equipment assumptions. Use prior documents as prompts, then reconfirm the shipment-specific facts. A historical successful call is useful background, but it does not replace present information about the proposed vessel and terminal.
Another mistake is hiding flexibility. If several loading terminals are possible, disclose the option and its decision deadline. Owners may assess a genuine option differently from a fixed destination. Conversely, avoid advertising flexibility that the seller or receiver cannot actually grant.
Finally, do not ask for a firm-looking price while withholding information essential to its basis. A qualified indication can help budgeting, provided everyone understands what remains unresolved and what would require repricing.
Where Zeaclub fits
Zeaclub provides a multi-party shared workspace for owners, charterers, brokers and port agents.
Zeaclub offers digitalised procedures across the voyage workflow.
Explore Zeaclub
Educational information only; not legal, financial or trading advice. Contract wording and applicable rules control. Verify current requirements and obtain qualified advice before acting.
Frequently asked questions
Should the enquiry name a specific ship size?
It can identify the preferred market segment, but the cargo and port requirements should drive the search. Include the intended parcel and operational constraints so owners can explain whether their individual vessel is suitable.
Can an enquiry be circulated before cargo documents are complete?
Yes, as an initial commercial exercise with clearly identified gaps. State which documents are pending, who will provide them and whether the response is expected to remain subject to their review.
Is a vessel questionnaire enough?
A questionnaire describes a ship; it does not fully describe the job. Pair vessel information with cargo, terminal and schedule information so the relevant parties can assess the proposed combination.
How should alternative proposals be handled?
Invite alternatives in a separate section. Require the respondent to identify the changed assumption, such as equipment provision or loading place, so an alternative does not become confused with a compliant base proposal.