Bow view of a bulk carrier at anchor

Key takeaways

  • Read the actual quotation to identify what quantity its rate applies to.
  • Do not infer a freight basis from the buyer's commodity-pricing basis.
  • Use supported measurements and qualified interpretation for real cargo data.
  • Keep a commercial conversion separate from any technical cargo-acceptance assessment.
  • Compare total costs before presenting a normalized unit figure.

Find the unit behind the rate

A proposal expressed per tonne should specify the basis used to calculate its charge. If a commercial analysis also contains a dry-material equivalent or another adjusted quantity, identify that measure separately. The same word tonne can otherwise conceal different calculations.

This article does not claim that every bauxite sale or freight proposal uses a particular convention. It addresses the comparison problem whenever the actual transaction contains different quantity bases. Obtain the relevant terms rather than assuming an industry default.

The shipper's cargo evidence, the sale contract and the transport quotation serve different purposes. A quantity used to value the commodity does not automatically establish the freight charge. Equally, the quantity used for freight does not by itself determine a sale adjustment.

Start by displaying the total amount derived under each proposal's stated basis. Then calculate any common comparison metric transparently. This preserves the commercial meaning of the quotation while allowing a useful analytical comparison.

Keep arithmetic apart from cargo acceptance

IMO's historical bauxite warning addresses instability associated with certain fine-particle cargoes and excess moisture. IMO bauxite warning.

A moisture-related commercial calculation is not a technical acceptance assessment. Check the current applicable text and obtain the responsible qualified review for the actual parcel. Nothing in the arithmetic below establishes that a cargo is suitable for shipment or identifies the requirements it must meet.

For a real conversion, use the supported measurement and its stated basis. Ask qualified cargo personnel to resolve technical questions rather than adapting a value from an unrelated sample. The analyst should be able to explain which parcel the input represents and why it is appropriate for the intended commercial calculation.

If that basis is unresolved, leave the normalized output provisional. A precise decimal result does not improve an unsupported input. It can instead make the comparison appear more certain than the evidence permits.

A checked illustrative conversion

The figures below are invented to explain the denominator effect. The example defines moisture as a fraction of the wet mass solely for its stated arithmetic. It does not prescribe a test method, a contractual convention or a safe cargo condition.

ILLUSTRATIVE: A fictional parcel has 40,000 wet tonnes and an assumed moisture fraction of 12% of wet mass. Its calculated dry-material equivalent is 40,000 × (1 − 0.12) = 35,200 dry tonnes.

ILLUSTRATIVE: A fictional transport amount of USD 880,000 equals USD 22.00 per wet tonne, calculated as USD 880,000 divided by 40,000. The same amount equals USD 25.00 per calculated dry tonne, divided by 35,200. The amount has not changed; only the denominator has changed.

ILLUSTRATIVE: A second supported transport proposal for the same fictional parcel totals USD 862,400. Its comparison figures are USD 21.56 per wet tonne and USD 24.50 per calculated dry tonne. Its total is USD 17,600 lower, regardless of which common denominator is used consistently.

Comparing the first proposal's wet-tonne rate with the second proposal's dry-tonne figure would be misleading. They are not expressed on the same basis. Once both use a common denominator, the total-cost ranking remains clear.

The normalized dry-tonne figure is an analytical measure in this example. It does not change the transport amount or rewrite the payment terms. Keep the actual quoted basis visible beside any converted output.

Normalize scope as well as quantity

A correct unit conversion cannot repair a service mismatch. Check that the proposals address the same origin boundary, intermediate transfer arrangement if any, and receiving endpoint. Add supported exclusions or remove proven duplication before comparing totals.

Do not assume that a lower total reflects a better price if one proposal omits a required service. It may simply describe less work. Conversely, a broader package should not be penalized for including services that the other proposal expects the buyer to purchase separately.

Where quantities differ between alternatives, explain why. A different proposed parcel may change more than the denominator: it can affect total cost, sale value and receiving needs. Treat that as a separate scenario rather than presenting it as a pure rate comparison.

The strongest comparison has two transparent layers: the actual charge calculation under each proposal and a common analytical view of equivalent service. Readers can then see both what they would pay and how the alternatives were normalized.

Use a unit and scope register

FieldWhat to recordError it prevents
Transport rate basisExact unit and stated quantity treatmentImporting the sale basis into freight
Shipment quantitySupported parcel and measurement basisUsing an unrelated purchase or planning figure
Conversion inputApplicable evidence and definitionMixing different moisture or adjustment conventions
Total transport amountCalculation under the actual proposalRanking incompatible unit rates
Additional servicesSupported scope and priceOmitting a necessary stage
Common denominatorClearly named comparison quantityPresenting wet and dry figures as equivalent
Technical statusRelevant qualified assessmentTreating commercial arithmetic as cargo acceptance

The register should use plain language as well as abbreviations. A reviewer unfamiliar with the spreadsheet should be able to tell whether a number describes physical shipment mass, an adjusted commercial measure or a chargeable quantity under the proposal.

A fictional analyst finds a false price gap

In this fictional case, a buyer receives two bauxite logistics summaries. One states a cost per wet tonne; the other expresses the amount per calculated dry tonne for internal commodity analysis. The buyer initially treats the lower-looking figure as the more attractive transport proposal.

The analyst reconstructs both total amounts and applies the same supported comparison quantity. It becomes clear that part of the apparent difference came from unlike denominators. The remaining difference is then examined through actual service inclusions and exclusions.

The team preserves the original quotation terms and labels the normalized figures as analytical outputs. It also keeps cargo acceptance outside the pricing calculation and obtains the relevant qualified assessment separately.

The fictional lesson is that unit discipline comes before negotiation. Asking a provider to match an incompatible rate can distract from the real commercial difference between the proposals.

Common mistakes

Using a moisture figure without identifying its definition or parcel can make a conversion unreliable. Obtain the appropriate evidence and interpretation before relying on the result.

Another mistake is comparing a wet-tonne rate with a dry-tonne metric. Name the denominator and use the same basis for equivalent alternatives.

Finally, do not treat a normalized unit cost as a new contract term or a technical cargo conclusion. It is a comparison output with a defined purpose and limited scope.

Where Zeaclub fits

Zeaclub offers digitalised procedures across the voyage workflow.

Zeaclub provides 24/7 operating systems and worldwide coverage.

Explore Zeaclub

Learn about Zeaclub

Educational information only; not legal, financial or trading advice. Contract wording and applicable rules control. Verify current requirements and obtain qualified advice before acting.

Frequently asked questions

Does every bauxite freight quote use wet tonnes?

Do not assume a universal convention. Read the actual proposal and confirm its calculation basis before comparing it with another offer.

Can the same total have different unit costs?

Yes. Dividing by different quantity measures produces different unit figures. That does not change the total amount being allocated.

Does a dry-tonne conversion establish cargo suitability?

No. Commercial arithmetic and technical cargo assessment are separate. Obtain the relevant qualified review under current applicable requirements.

Which figure should lead the comparison?

Show the supported total and service scope first, then a clearly labeled common unit measure. Preserve each proposal's actual charge basis alongside it.

What if the conversion input is uncertain?

Keep the normalized result provisional and explain the uncertainty. Do not present an unsupported precise output as a settled commercial comparison.