An empty hold is not the end of the operation
During bulk discharge, a damaged fitting or distorted piece of steel can be easy to overlook amid cargo residues and moving equipment. The International Maritime Organization’s BLU Code addresses safe loading and unloading as a shared concern for masters and terminals. Its guidance calls on the terminal to avoid damage when using unloading or hold-cleaning equipment and to report damage to the master if it occurs.
That creates a separate question from whether all cargo has been removed: what condition is the ship in now? IMO inspection guidance notes that loading or unloading can cause structural damage suddenly and, in severe cases, put the ship’s safety at risk unless it is dealt with promptly. A departure decision therefore needs a damage handover, not just confirmation that the discharge tally is complete.
BLU Code and BLU Manual — International Maritime Organization · Resolution A.866(20): Guidance to Ships’ Crews and Terminal Personnel for Bulk Carrier Inspections — International Maritime Organization · Resolution A.862(20): Code of Practice for the Safe Loading and Unloading of Bulk Carriers — International Maritime Organization
Establish what can be seen—and what was there before
A useful handover starts with a clear description of the affected hold or item and the condition observed. The IMO recommends inspections of cargo holds before loading and after unloading, while acknowledging practical limits. It also recommends keeping an onboard log of inspections. Those records give the crew a basis for comparing a newly noticed defect with an earlier observation, rather than assuming either that every mark is new or that an old-looking mark is harmless.
Inspection should follow the structure, not only the path taken by the grab. IMO guidance draws attention to damage-prone areas of cargo holds and to cracking around hatchway corners and other stressed deck connections. A crew observation is valuable for identifying a concern, but the same guidance cautions that ship and terminal inspections do not replace surveys by the flag State or its recognized organization.
Raise the concern while the operation can still be controlled
If discharge has caused damage, created a hazardous situation or appears likely to do so, the BLU Code calls for the terminal representative to be warned immediately. It likewise says the terminal should report damage caused by unloading or hold-cleaning equipment to the master. The practical first exchange should identify the location, what was observed and whether equipment is still working near it. That gives both sides a specific condition to address rather than a vague complaint at completion.
The concern may also affect how discharge continues. The BLU Code says the terminal representative should follow the agreed unloading plan and consult the master when a change is needed; rates and sequences should not be altered without prior consultation and agreement. If an affected area needs to be kept clear for examination, ship and shore should agree how the remaining work will proceed instead of allowing an informal equipment move to become an unexamined change.
Separate a visible defect from a repair decision
Not every scrape has the same consequence, and neither the appearance of a defect nor the absence of an obvious leak settles its significance. IMO inspection guidance says structural damage can arise quickly during cargo work and that crew inspections cannot substitute for formal surveys. Describe the observed condition accurately; leave conclusions about structural capability to the parties equipped to assess it.
The BLU Code provides a clear escalation threshold: if damage could impair the hull’s structural capability or watertight integrity, or the ship’s essential engineering systems, the flag Administration or its recognized organization and the appropriate port-State authority should be informed. Those authorities are to address whether repair must be immediate or can be deferred. UK Maritime and Coastguard Agency guidance also highlights reporting of damage affecting seaworthiness, structural integrity or essential engineering systems. This is not a decision for a cargo tally or a casual assurance from either side.
Resolution A.866(20): Guidance to Ships’ Crews and Terminal Personnel for Bulk Carrier Inspections — International Maritime Organization · Resolution A.862(20): Code of Practice for the Safe Loading and Unloading of Bulk Carriers — International Maritime Organization · Annex B: Loading, Unloading and Stowage of Solid Bulk Cargoes and the BLU Code — UK Maritime and Coastguard Agency
Close the ship–shore record, not merely the hatch
At completion, confirm which holds the terminal considers discharged, then distinguish cargo completion from the condition of the ship. The BLU Code calls for the terminal representative to advise the master when unloading is considered complete from each hold. Its inspection guidance recommends a log of inspections, so the post-discharge check should produce a usable record of what was examined and what remains unresolved.
A sound close-out records the affected location, the observed condition, notifications made and the outcome of any assessment or repair. It should not describe a concern as resolved simply because discharge has ended. Where damage meets the BLU Code’s escalation threshold, the action taken—repair or deferral—must satisfy the relevant authorities; an immediate repair, when required, should satisfy the master before departure. That distinction keeps the operational handover aligned with the ship’s actual condition.
Resolution A.866(20): Guidance to Ships’ Crews and Terminal Personnel for Bulk Carrier Inspections — International Maritime Organization · Resolution A.862(20): Code of Practice for the Safe Loading and Unloading of Bulk Carriers — International Maritime Organization
Primary sources
- BLU Code and BLU Manual — International Maritime Organizationunknown · Accessed 2026-10-15
- Resolution A.866(20): Guidance to Ships’ Crews and Terminal Personnel for Bulk Carrier Inspections — International Maritime Organization1997-11-27 · Accessed 2026-10-15
- Resolution A.862(20): Code of Practice for the Safe Loading and Unloading of Bulk Carriers — International Maritime Organization1997-11-27 · Accessed 2026-10-15
- Annex B: Loading, Unloading and Stowage of Solid Bulk Cargoes and the BLU Code — UK Maritime and Coastguard Agencyunknown · Accessed 2026-10-15
Availability and commercial terms require direct confirmation.